Implementasi Critical Path Method (CPM) Dalam Pengembangan Sistem Informasi Manajemen Kontraktor Pada PT. Sari Karya Mandiri

Authors

  • Irvan Yohanes LIm Universitas Katolik Widya Mandira, Kupang
  • Emanuel Jando Universitas Katolik Widya Mandira, Kupang
  • Yovinia Carmeneja Hoar Siki Universitas Katolik Widya Mandira, Kupang

Keywords:

Sistem Informasi, Manajemen Kontraktor, CPM, Waterfall

Abstract

The development of a Contractor Management Information System is very important for the construction industry, particularly for PT. Sari Karya Mandiri, which has many permanent employees and projects that are physically completed. This research aims to develop a web-based management information system using the Critical Path Method (CPM) as a project management tool to make PT. Sari Karya Mandiri’s operations more efficient and effective. This framework is expected to address issues such as cost control, human asset management, unstructured project management, and improve project execution time efficiency. The system development method uses the waterfall model. The stages of completion include system requirements analysis, design, development, implementation, and testing. Testing is conducted to evaluate how well the system handles construction project management. The results of the research show that this framework can improve project planning, thereby reducing delays. The administrative data framework can function efficiently at PT. Sari Karya Mandiri and enhance the sustainability of the construction industry as a whole.

References

. Hayati, Kemala. 2020. “Sistem Manajemen Klaim Berbasis Sistem Informasi”. Aceh : CV. Seva Bumi Persada, Desember 2020, Halaman. 153, ISBN: 978-623-7648-90-1.

. Iis, Kartini, Abdullah, Riauwati, J, Yoeliastuti, Tannady. H, Khasanah, Batubara, H. C, Kamisi H. L, Liana W, Purbaningsih Y. 2022. “Manajemen Proyek”. Batam : Cendikia Mulia Mandiri, Maret 2024, Halaman. 124, ISBN: 978-623-88234-2-0.

. Muhammad, A, Kurniawan, B, Mufidah, A.P, La Dai, D, M, Pakarbudi, A. 2021. Analisa Jalur Kritis Pada Penjadwalan Proyek Pengembangan Sistem Informasi Menggunakan Teknik Critical Path Method (CPM) (Studi Kasus : PT. XYZ). Seminar Nasional Sains dan Teknologi Terapan IX 2021 – Institut Teknologi Adhi Tama Surabaya. pp: 538 – 548.

. Dwiretnani, A, Handayani E, Saputra N. 2023. Evaluasi Penjadwalan Waktu Proyek Pembangunan Gedung Menggunakan Critical Path Method (CPM). Jurnal Talenta Sipil: Program Studi Teknik Sipil Fakultas Teknik Universitas Batanghari. Vol. 6 No. 2, Agustus 2023, 391-400. ISSN 2615-1634 (Online), DOI 10.33087/talentasipil.v6i2.334

. Saputro, A., Kusnul Yakin, & Maulidya Octaviani. (2023). Analisis Percepatan Proyek Serta Pengaruhnya Terhadap Waktu Dan Biaya Menggunakan Metode Critical Path Method (CPM): Analysis of Project Acceleration and Its Effect on Time and Cost Using the Critical Path Method (CPM). CONCRETE: Construction and Civil Integration Technology, 1(01), 27-36. https://doi.org/10.25139/concrete.v1i01.6166

. Damara, B., Hepiyanto, R. 2021. Optimalisasi Waktu dan Biaya Pada Proyek Gedung Pertanahan Nasional Kota Blitar Dengan Metode Critical Path Method (CPM). JURMATEKS : Jurnal Manajemen Teknologi & Teknik Sipil e ISSN2621-7686Vol. 4, No. 1, pp:120 – 133.

. Putri, F. C., Alpian, Ristiandi I. L., Tasya, T. N. 2023. Perhitungan CPM Pada Proyek Improvement Sistem Automatis OEE Pada Line Produksi SKM PT Indolakto. Metode Jurnal Teknik Industri, Vol. 9 No. 1, pp: 12-21.

. Arsiwi, P., Talitha, T., Nugroho, D. S., Pradityatama, M. 2023. Analysis of Critical Activity in the Hydromechanical Component Fabrication Project for Dam “X” using the Critical Path Method. OPSI : Jurnal Optimasi Sistem Industri. Vol. 16, No.1, Juni 2023, pp: 138 – 147.

. Burhan, M. I., Singkeruang, A. W. T. F. ., & Alam, N. (2023). Implementasi Metode PERT dan CPM pada Proyek Integrasi Sistem Informasi Kontrol Pemantauan Kondisi Lalu Lintas . BUGIS : Journal of Business, Technology, &Amp; Social Science, 1(2). Diambil dari https://www.ojs.nitromks.ac.id/index.php/jurnal-bugis/article/view/114

. Hanif, A., & Ramadhan, R. H. (2021). Pengembangan Sistem Informasi Penjualan Kamera CCTV Berbasis Web Menggunakan Model Waterfall. JAIS - Journal of Accounting Information System, 1(2), 57-62. https://doi.org/10.31294/jais.v1i02.945

. Mintarsih, M. (2023). Pengujian Black Box Dengan Teknik Transition Pada Sistem Informasi Perpustakaan Berbasis Web Dengan Metode Waterfall Pada SMC Foundation. Jurnal Teknologi Dan Sistem Informasi Bisnis, 5(1), 33-35. https://doi.org/10.47233/jteksis.v5i1.727

. Siki, Y. C. H. ., Talo, M. C., & Mamulak, N. M. R. (2024). Implementasi Model Rapid Application Development (RAD) dalam Pengembangan Website Penjualan Produk UMKM Bikomi Utara. Jurnal Penelitian Inovatif, 4(1), 177–184. https://doi.org/10.54082/jupin.264

. Hoar Siki, Y. C., Manehat, D. J., Ngaga, E., & Bria, Y. P. (2024). Implementasi Website Penjualan Bagi Pelaku UMKM Desa Napan – Bikomi Utara. Jurnal Pengabdian Kepada Masyarakat Nusantara, 5(1), 593-599. https://doi.org/10.55338/jpkmn.v5i1.2682

Downloads

Published

2025-06-03